Site access should be checked before materials arrive, not while a delivery is waiting. The note needs entry point, unloading area, timing, contact, and any obstruction.

Look at turning space and walking routes separately. A truck path and a crew path can fail for different reasons.

Record the first fallback if access is blocked.

This owned editorial page includes no client backlink or project URL.